Server room from the shell
During my apprenticeship I helped build a complete server room for Siemens. From handover of the bare shell to live operation: 19-inch racks mounted, structured cabling run, fibre connected, every port labelled and cleanly documented.
The documentation mattered as much as the cabling. Anyone hunting a fault two years from now should be able to read at the patch panel what goes where.